Restroom renovations continue

A message from CSUSB’s Facilities Services department:

Pfau Library Restroom Renovation Phase 2: The restrooms being affected by this renovation are the restrooms located on the south side of the library in what is considered the old side on the basement, 3rd, and 4th floors. Additionally, the restrooms on the north side of the library basement (considered the new side) will also be closed.

The restrooms located on the north side of the library (behind the elevators on the new side) on the 3rd and 4th floors will remain open and are available for use. The restroom located on the east side of the basement will also remain open and available for use. Signage will be in place on the affected floors directing traffic to the open restrooms.

In regards to the first floor; the restroom located on the south side lobby will be closed for renovation. There are accessible restrooms located on the north side of the second floor. This is accessed by using the elevators on the west side (new side) of the first floor and going up to the second floor. Again, signage will be in place to direct traffic to these restrooms as well.

Again, should you have any questions or comments, please feel free to contact Rich Hebert at x77200 or send him an email at rhebert@csusb.edu. Thank you.

Posted in Miscellaneous